Upgrading the roof of the Block A building at the Institut Kefahaman Islam Malaysia
Maintenance and repair works for the air conditioning at the SUKE Toll Plaza.
Air conditioning repair and maintenance works for 48 months at the MAIWP.
Supply and installation of 208 air conditioning units across all Klinik Kesihatan Negeri Kedah.